Facility comparison

Featuring all of our facilities.
Number of data halls
Max floor load capacity (kg/m2)
Max raised access floor height (mm)
Target PUE
2
1500
600
1.3
2
1500
600
1.3
3
1000
0
1.3
1
1000
600
1.1
8
1.2
9
1.2
Number of data halls
Max floor load capacity (kg/m2)
Max raised access floor height (mm)
Target PUE
Type of system
Full Internal/External CCTV
Audited access procedure
Electronic gate access
Full perimeter security
Roving security based onsite
Proximity access card
Proximity access card
Proximity access card
Proximity access card
Type of system
Full Internal/External CCTV
Audited access procedure
Electronic gate access
Full perimeter security
Roving security based onsite
High sensitivity detection system
Type of fire suppression system
Automatic / Manual (FM200 and argonite)
Automatic / Manual (FM200 and Argonite)
Automatic / Manual (FM200 and Argonite)
Automatic / Manual (Novec system)
VESDA, FM200
High sensitivity detection system
Type of fire suppression system
Type of cooling system
Maximum cooling capacity
Cooling redundancy
CCUs or in-row cooling
DX
2
N+1
CCU & In Row
DX
1
N+1
CCU & In row
DX
1.5
N+1
In row
Adiabatic
10
N+1
CCU
N+1 chilled water and DX
N+1
In-row
VESDA, gas suppression
N+1
CCU
Type of cooling system
Maximum cooling capacity
Cooling redundancy
CCUs or in-row cooling
Number of independent supplies to building
Substations supplying power
Total incoming feed capacity (MVA)
Generator fuel at full load (hours)
UPS type
UPS capacity (kW)
UPS redundancy
Generator redundancy
Generator capacity (kW)
Fuel type
2
2
2
168
Static
2000
N+1 or 2(N+1)
N+1
4
Diesel fuel
2
1
1.5
168
Static
1000
N+1
N+1
1.5
Diesel fuel
2
1
2
48
Static
1500
N+1
N+1
2
Diesel fuel
2
2
15
48
Static
6000+
2N+1
N+1
10
Diesel fuel
2
40
74
N+N & N+1
N+N & N+1
40 x N+1
2
13
57
Static & DRUPS
N+1
N+1
Diesel
Number of independent supplies to building
Substations supplying power
Total incoming feed capacity (MVA)
Generator fuel at full load (hours)
UPS type
UPS capacity (kW)
UPS redundancy
Generator redundancy
Generator capacity (kW)
Fuel type
Number of diverse entry points into building
Number of meet me rooms
Connected carriers
4
2
14+
4
2
14+
2
1
14+
2
2
14+
14+
14+
Number of diverse entry points into building
Number of meet me rooms
Connected carriers
Conference rooms
Restrooms
Showers
Client WiFi
Conference rooms
Restrooms
Showers
Client WiFi
Number of passenger lifts
Number of goods lifts
Goods lifts max load (kg)
Separate delivery barys
1
1
1500 kg
1
N/A Ground floor
N/A Ground floor
N/A Ground floor
1
1
1
1
1
1
1
1
Number of passenger lifts
Number of goods lifts
Goods lifts max load (kg)
Separate delivery barys

BSO

BT Openreach

Cogent

Colt

Enivest

Eurofiber

Exascale

Exponential-E

Fibrespeed

Fluidone

GTT

Gamma

Global Connect

Hurricane Electric

KPN Telecom

Lumen

Lunar Connect

M247

Nasstar

Neos Networks

Relined Fiber Network

Sognenett

TalkTalk

Tele2

Telenor

Verizon

Virgin Media Business

Vodafone

Zayo Group

euNetworks

BSO

BT Openreach

Cogent

Colt

Enivest

Eurofiber

Exascale

Exponential-E

Fibrespeed

Fluidone

GTT

Gamma

Global Connect

Hurricane Electric

KPN Telecom

Lumen

Lunar Connect

M247

Nasstar

Neos Networks

Relined Fiber Network

Sognenett

TalkTalk

Tele2

Telenor

Verizon

Virgin Media Business

Vodafone

Zayo Group

euNetworks

Equinix MA1

Equinix MA2

Equinix MA3

Equinix MA4

Equinix MA5

LDeX1 (London)

LDeX2 (Manchester)

Lumen Goswell Road (London)

Lunar 1

Lunar 2

Lunar 3

Lunar 4

Telehouse North (London)

Equinix MA1

Equinix MA2

Equinix MA3

Equinix MA4

Equinix MA5

LDeX1 (London)

LDeX2 (Manchester)

Lumen Goswell Road (London)

Lunar 1

Lunar 2

Lunar 3

Lunar 4

Telehouse North (London)

Amazon Web Services

Google Cloud Platform

Lunar Cloud Connect

Microsoft Azure

Oracle Cloud

Amazon Web Services

Google Cloud Platform

Lunar Cloud Connect

Microsoft Azure

Oracle Cloud

AMS IX

LINX

NL IX

AMS IX

LINX

NL IX

Facility comparison

A technical breakdown of our four facilities.
General information
Number of data halls
Max floor load capacity (kg/m2)
Max raised access floor height (mm)
Target PUE
Security
Type of system
Full Internal/External CCTV
Audited access procedure
Electronic gate access
Full perimeter security
Roving security based onsite
Fire protection
High sensitivity detection system
Type of fire suppression system
Cooling systems
Type of cooling system
Maximum cooling capacity
Cooling redundancy
CCUs or in-row cooling
Cooling systems
Number of independent supplies to building
Substations supplying power
Total incoming feed capacity (MVA)
Generator fuel at full load (hours)
UPS type
UPS capacity (kW)
UPS redundancy
Generator redundancy
Generator capacity (kW)
Fuel type
Connectivity
Number of diverse entry points into building
Number of meet me rooms
Connected carriers
Amenities
Conference rooms
Restrooms
Showers
Client WiFi
Amenities
Number of passenger lifts
Number of goods lifts
Goods lifts max load (kg)
Separate delivery barys
2
1500
600
1.3
Proximity access card
Automatic / Manual (FM200 and argonite)
DX
2
N+1
CCU & In Row
2
2
2
168
Static
2000
N+1 or 2(N+1)
N+1
4
Diesel fuel
4
2
4
1
1
1500 kg
1
2
1500
600
1.3
Proximity access card
Automatic / Manual (FM200 and Argonite)
DX
1
N+1
CCU & In row
2
1
1.5
168
Static
1000
N+1
N+1
1.5
Diesel fuel
4
2
4
N/A Ground floor
N/A Ground floor
N/A Ground floor
1
3
1000
0
1.3
Proximity access card
Automatic / Manual (FM200 and Argonite)
DX
1.5
N+1
In row
2
1
2
48
Static
1500
N+1
N+1
2
Diesel fuel
2
1
4
1
1
1
1
1
1000
600
1.1
Proximity access card
Automatic / Manual (Novec system)
Adiabatic
10
N+1
CCU
2
2
15
48
Static
6000+
2N+1
N+1
10
Diesel fuel
2
2
4
1
1
1
8
1.2
VESDA, FM200
N+1 chilled water and DX
N+1
In-row
2
40
74
N+N & N+1
N+N & N+1
40 x N+1
4
9
1.2
VESDA, gas suppression
N+1
CCU
2
13
57
Static & DRUPS
N+1
N+1
Diesel
4